Distribution
Steele Creek Logistics Park, Building C
- Square footage
- 142,000 sq ft
- Duration
- 9 weeks
- System
- 60 mil TPO, mechanically attached
- Completed
- 2026
Phased in four sections so inbound freight never lost a dock door.
Project history
Building type, area, system, duration, and completion year. Full references and contract documentation on any of these projects are available at proposal stage.

Distribution
Phased in four sections so inbound freight never lost a dock door.

Retail center
Tenant notification letters issued two weeks ahead of each storefront section.

Medical office
Cold-applied throughout to avoid odor intrusion at the air intakes.

School
Full scope completed inside the summer break window.

Manufacturing
Sub-purlin retrofit installed over the failed panel with no production shutdown.

Warehouse
Three buildings sequenced across one season under a single capital budget.

Office
Tapered package corrected 30 years of standing water at the interior drains.

Grocery / cold storage
Night work only, with continuous temperature monitoring inside the freezer envelope.